The plan consists of three buildings:
SO 01 Desilting the pond Předehřívák
SO 02 Pool above the pond Předehřívák
SO 03 Pool under the pond Koupaliště
It concerns the removal of sediments from the Předehřívák pond (SO 01), which is built on the Bobrůvka watercourse (IDVT: 10100048, ČHP: 4-15-01-076). VT Bobrůvka is managed by Povodí Moravy, s.p. As part of the project, it is proposed to build ponds and landscaping in the PB floodplain of Bobrůvka (SO 02) in the area above the Předehřívák pond up to a distance of approx. 110 m from the end of the pond's embankment. As part of SO 03, swimming pools are designed in the locality under the dam of the Koupaliště pond to the right of Bobrůvka.